PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Stripped shear walls at Elev. 5,6 (3rd and 4th Floor) Facing North (800x600).jpg Finished installing the shear wall panels at Stair -4 (3rd Floor) Facing North-East (800x600).jpg Installing platforms around Elev. 1,2,3 (4th Floor) Facing East (800x600).jpg
Previous pageNext page Finished installing the shear wall panels at Stair -4 (3rd Floor) Facing North-East (800x600)
Finished installing the shear wall panels at Stair -4 (3rd Floor) Facing North-East (800x600)